FEATURED PROJECTS

Please take a look below at some of the many projects we have completed.

We have compiled some case studies of some of the many projects we have worked on.

17/10/2018

George Washington Bridge

$249,000 APPROX CONTRACT VALUE

25 PERSONEL WORKING ON THE PROJECT

300 HOURS OF WELDING

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

20/05/2010

National Science Foundation

$36,463 APPROX CONTRACT VALUE

20 PERSONEL WORKING ON THE PROJECT

300 HOURS OF WELDING

Brakewell fabricated this house lift for the National Science Foundation. We shipped the first completed base to Greenland back in 2009. Its purpose was to aid in the study of global warming. The house lift was designed to be able to lift the building up above the snow and ice that is constantly rising. As a result, each column is expandable allowing the building to remain in its location for a longer period of time. However, the time eventually comes when the ice and snow drift levels rise enough to completely cover the extended columns. When that happens the building is lifted off the old base and moved onto a new one, and the process begins again. We fabricated 2 of these structures along with the deck outriggers, a steel sled for transport and a steel cover to be used for gasoline storage.

14/01/2010

Liberty Street Bypass Bridge

$49,700 APPROX CONTRACT VALUE

HOURS OF WELDING

Brakewell fabricated this elevator tower for the Liberty Street Bypass Bridge.

22/05/2007

158th Street Pedestrian Access

18 PERSONEL WORKING ON THE PROJECT

200 HOURS OF WELDING

Brakewell Steel fabricated 158th street pedestrian access platform. For this project Brakewell fabricated the access platform in its entirety along with the fencing, railings, and stairs. This is only one of many access platforms we have fabricated over the years. We hold an AISC certification in 3 categories, and we are also an approved fabricator for the MTA, NYSDOT, NYCDOT, and Transit Authority. As a result, the Brakewell team has become increasingly efficient with access platforms such as this.

8/01/2007

Poughkeepsie Station

HOURS OF WELDING

Brakewell has done many different projects for Metro North Railroad. Shown here is the work done for the Poughkeepsie station. It included a new canopy and some repairs to the beamwork as well.

25/10/2018

Camera Obscura

10 PERSONEL WORKING ON THE PROJECT

50 HOURS OF WELDING

Brakewell Steel frequently fabricates frames like the one used here. As a result, we are used to seeing our work covered in cladding or submerged in cement. Working on this project was a joy for our shop. There are 50 public camera obscuras located throughout the world, and this is one of only 5 in the United States. If you would like more information on this camera obscura please follow the link below.

http://villageofgreenport.org/camera-obscura-mitchell-park-greenport-village.php

25/10/2018

JFK Airport

22 PERSONEL WORKING ON THE PROJECT

300 HOURS OF WELDING

We have fabricated numerous items for JFK airport over the years. Easily our most memorable was fabricating the skylight canopy for the pedestrian access platform for the air tram.

25/10/2018

Integrated Outpatient Services

35,000 APPROX CONTRACT VALUE

5 PERSONEL WORKING ON THE PROJECT

20 HOURS OF WELDING

25/10/2018

Hutong Restaurant

45,000 APPROX CONTRACT VALUE

18 PERSONEL WORKING ON THE PROJECT

200 HOURS OF WELDING

25/10/2018

Harvard University

20 PERSONEL WORKING ON THE PROJECT

400 HOURS OF WELDING